When the inspector came for the 4 way inspection, he pronounced everything good except the insulation. Ivory had done R11 insulation and he said that we needed R13. So, we had to get extra insulation installed. Hopefully, that will mean that the basement will stay warmer in the winter. Around that time they also finally opened up the doorway at the bottom of the stairs. I love it! It makes a much bigger and open landing. I can't believe how fast it is going!
No comments:
Post a Comment